Sanivar have recently completed a challenging refurbishment of a rising main feeding Calder Treatment Works in Wakefield.
Working with Peter Duffy Ltd, this job involved relining a 300mm cast iron main, a section of which ran via a pipe bridge under a mainline railway. The high-pressure rising main was badly corroded and previous temporary repairs using clamps had been unsuccessful, necessitating the refurbishment of a 250 metre section. The pipe bridge crossed the River Calder and there were pollution concerns arising from the condition of the exposed section, particularly when pressurized.
Customer | Yorkshire Water |
Country | UK |
Installation date | 2020 |
Products | SaniTube |
DN | |
Application area | Waste water |
Use case | Public Utility |
Pipe material | N/A |
Number of seals | N/A |
Track length | |
Operating pressure | N/A |
Categories: SaniTube